Sarros Hot Water
Terms and Conditions
Supply & Installation Package Terms
ABN: 42 632 273 879 | 9/49 Biscayne Way, Jandakot WA 6164 | (08) 9226 7900
Electrical Contractor License: EC12050 | Plumbing License: PL8405
Hot Water System Supply & Installation Package
-
Scope of Work
Includes supply and installation of a new hot water system (HWS), with all standard labour for safe connection to existing services. Work is performed by licensed technicians and complies with Australian Standards and local regulations.
-
Package Inclusions
- New hot water system supply (as quoted)
- Standard installation labour
- Basic electrical and/or gas connections (where existing supply is adequate and compliant)
- Standard plumbing connections to replace existing unit
- System commissioning and safety testing
- Customer handover with usage and maintenance instructions
-
Exclusions
Quoted price excludes additional works or modifications, such as:
- Non-standard valves, fittings, or pipework
- Supply upgrades or modifications
- Concrete base or structural changes
- Drainage or overflow solutions
- Switchboard, electrical, or gas upgrades
- Removal/disposal of old units (unless specified in writing)
-
Additional Charges
Any non-standard items or extra work will be quoted separately and only performed with written customer approval.
-
Customer Responsibilities
- Provide safe and clear access for installation
- Ensure sufficient space/clearance for unit
- Verify supply compliance
- Arrange required approvals or permits if needed
- Ensure an adult (18+) is present during installation
- Secure pets and keep area accessible at agreed time
-
Installation Timeline
- Estimated timeframes advised at booking
- Standard jobs typically completed in 1 business day
- Timelines may be affected by weather, supply, or site complications
- Reasonable notice given for installation or changes
- Works performed during standard business hours
-
Warranty Coverage
- Unit: Manufacturer’s warranty (varies by brand/model)
- Installation: Sarros lifetime workmanship guarantee
- Warranty claims require full payment and maintenance compliance
-
Site Assessment
- Pre-installation site assessment may be required for non-standard jobs
- Assessment fee may apply if installation cannot proceed
- Customers advised in advance of special requirements
- Installations may be rescheduled due to site conditions
-
Acceptance
Booking an installation confirms the customer has read, understood, and agrees to these Terms and Conditions.
Gas Hot Water System Supply & Installation Package
-
Scope of Work
Includes supply and installation of a gas hot water system by licensed Sarros gas fitters, compliant with Australian Standards, WA plumbing codes, and gas safety regulations.
-
Package Inclusions
- Gas hot water unit supply
- Standard installation labour
- Basic gas connections (where supply is adequate and compliant)
- Standard plumbing to existing HWS location
- Flue installation and venting (standard configuration)
- System commissioning and gas leak testing
- Customer handover and operation instructions
- Gas compliance certificate
-
Exclusions
Quoted price excludes:
- Isolation valves, additional fittings, or pipework
- Gas line extensions/upgrades
- New gas meter or supply upgrades
- Concrete slabs or equipment pads
- Flue extensions/modifications
- Electrical connections for gas systems with electrical components
- Structural modifications or access improvements
- Removal/disposal of old units (unless specified)
- Council permits or approvals
- Gas leaks on existing property gas service/appliances
-
Additional Charges
Additional materials or services will be quoted and require written approval before commencement.
-
Customer Responsibilities
- Site readiness and clear access
- Adequate space for unit placement
- Compliant and accessible gas supply
- Obtain necessary permits/council approvals
- Adult (18+) present during installation
- Pets secured and area clear
- Disconnect existing gas appliances if required
-
Installation Timeline
- Estimated timeframes communicated at booking
- Standard installations completed within 1 day
- Timelines may change due to weather, supply, or site issues
- 24–48 hours notice of installation date
- Works during standard hours (7am–4pm)
- Gas compliance testing completed same day where possible
-
Warranty Coverage
- Unit: Manufacturer’s warranty (varies by brand)
- Installation: Sarros lifetime workmanship guarantee
- Parts/labour: Manufacturer covers parts; Sarros covers installation
- Warranty activation requires full payment and system registration
- Regular maintenance recommended for warranty validity
-
Site Assessment
- Pre-installation assessment may be required for complex jobs
- Assessment fee may apply if installation cannot proceed
- Customers advised of site-specific requirements in advance
- Installations may be rescheduled if site is unsuitable
- Gas supply adequacy assessed on site
-
Safety & Compliance
- All gas work by licensed WA gas fitters (PL8405)
- Gas compliance certificate issued on completion
- Complies with AS/NZS 5601 standards
- Mandatory gas leak testing performed
- Safety shutdown procedures explained at handover
-
Acceptance
Proceeding with installation confirms customer acceptance of these Terms and Conditions.
Switchboard Requirements for Electric Hot Water Systems
-
Pre-Work Requirements
- Asbestos switchboards must be upgraded and replaced before works commence
- All defects must be rectified before new works
- Comprehensive inspection conducted prior to commencement
-
Compliance and Safety
- All works comply with AS/NZS 3000 and WA Electrical Requirements
- Permits and inspections as required
- Modifications must meet current standards
- Main power isolation and safety barriers during works
- PPE and safety protocols enforced
-
Scope Limitations
- Works limited to agreed scope; additional defects quoted separately
- Meter box upgrades may require Western Power approval
- Existing cable condition assessed on-site
- Clear and safe access required
-
Testing and Certification
- All circuits tested for compliance
- Electrical Safety Certificate issued upon completion
- Remedial works quoted if circuits fail
-
Customer Responsibilities
- Switch off appliances before works
- Provide safe, hazard-free environment
- Arrange alternative power if needed
- Do not modify completed works
- Future works must be by licensed electricians
-
Warranty and Liability
- Sarros Lifetime Workmanship Guarantee covers installation works
- Guarantee covers workmanship only, not equipment failures
- Not liable for pre-existing faults or property damage during power isolation
- Force majeure may affect completion timeframes
-
Variation Management
- Scope changes require written approval
- Additional costs quoted before proceeding
- Customer may refuse variations, but original scope must meet safety standards
-
Completion and Handover
- Labels updated to reflect new configuration
- Customer briefing on operation and safety features
- Documentation and certificates provided
- Customer sign-off required before completion
- Photo documentation retained for quality assurance
-
Acknowledgment
Proceeding with switchboard works confirms customer acceptance of these terms.
Rebates & STCs for Supply & Installation Packages
-
Government Rebates & Small-scale Technology Certificates (STCs)
For eligible supply & installation packages, Sarros will process Small-scale Technology Certificates (STCs) and apply the value as a point of sale discount on your invoice. You receive the rebate immediately—no paperwork required on your part.
-
Eligibility & Processing
- STC eligibility is based on system type, property location, and government policy.
- Sarros will confirm your eligibility and the STC value at quotation.
- STCs must be assigned to Sarros as part of the agreement.
-
Application of Discount
- STC rebate is deducted from your invoice at point of sale.(Supply & Instllation Package)
- No further action is required from you—the discount is immediate.
-
Changes to Rebates
- Government rebate programs and STC values may change without notice.
- If rebate values change before installation, Sarros will notify you and update your quote.